Process, energy and industrial
Facilities priced from equipment lists and factored bulks before drawings exist, then carried through to control estimates as the design matures.
Carbon capture
Capture, compression, storage and transport, where the interfaces between processes are where cost hides. Estimates run from technology comparisons at Class 5 through to budget estimates for CO₂ hubs and import terminals, with battery limits between capture, conditioning and offtake defined explicitly so no scope falls between owners.
3 featured projectsMethanol and chemicals
Process facilities priced from equipment lists and factored bulks long before drawings exist.
2 featured projectsEnergy and power
Generation, plant upgrades and grid interconnections that are often missing from the first budget.
5 featured projectsIndustrial facilities
Expansions and brownfield tie-ins, where shutdown constraints set the productivity factor.
2 featured projectsPorts, transport, tunnels and water
Crew and production-rate estimating for public owners and contractors, under hard bid, design-build and progressive delivery.
Port and terminal storage
Container, bulk and liquid terminals, quays, shipyards and the marine works behind them. Fourteen featured assignments range from concept studies for greenfield terminals to bid support on brownfield expansions, with throughput, dredging and logistics assumptions clearly documented.
6 featured projectsTunnelling
Ground conditions, method and productivity drive the number more than quantities do.
1 featured projectHeavy civil
Earthworks, structures, roads and drainage, priced on crews and production rates.
2 featured projectsWater and wastewater
Treatment and conveyance under public procurement, with estimates documented for tender and review.
3 featured projectsTransport infrastructure
Roads, rail and structures under every delivery method, including progressive design-build.
5 featured projectsSelective work outside the core
One sector kept deliberately small, estimated with the same discipline as the rest.
Custom residential
Taken in small numbers, usually for clients who come back. Same discipline, smaller WBS.
Working in a sector that isn't here?
The method travels. If the work has a scope, a schedule and a budget, it can be estimated with the same discipline.