EMERALD GROUP
Emerald Group

Tag: <span>Cost control</span>

A WBS that survives construction

The estimate structure is inherited by cost control, scheduling and claims. How to build one all three can live with for five years.

Have a scope that needs a number?

Get in touch and we’ll confirm the right next step, expected level of effort, and availability.

Get in touch Connect on LinkedIn